Manhour Assumptions
1. MATERIALS
| # | Description | Need per set (m) | Sets | Std length/pc (m) | To buy (pcs) | Unit | KG/M | Price By | Unit Rate (RM) | Amount (RM) | |
|---|---|---|---|---|---|---|---|---|---|---|---|
| SUBTOTAL – MATERIALS | 0.00 | ||||||||||
2. CONSUMABLES
| # | Description | Qty | Unit | Unit Rate (RM) | Amount (RM) | |
|---|---|---|---|---|---|---|
| SUBTOTAL – CONSUMABLES | 0.00 | |||||
3. TRANSPORT
| # | Description | Qty | Unit | Unit Rate (RM) | Amount (RM) | |
|---|---|---|---|---|---|---|
| SUBTOTAL – TRANSPORT | 0.00 | |||||
4. CRANE
| # | Description | Qty | Unit | Unit Rate (RM) | Amount (RM) | |
|---|---|---|---|---|---|---|
| SUBTOTAL – CRANE | 0.00 | |||||
5. OTHERS
| # | Description | Qty | Unit | Unit Rate (RM) | Amount (RM) | |
|---|---|---|---|---|---|---|
| SUBTOTAL – OTHERS | 0.00 | |||||
6. MANHOURS
| # | Position / Role | Pax | RM/hr (Normal) | Normal Hrs/Day (×1.0) | OT Hrs/Day (×1.5 wkday) | Sun/PH Hrs/Day (×2.0) | Days without OT | Days with OT | Sun/PH days | Total Hours | RM/Day | OT Mult | Total RM |
|---|
Total Man-Hours
0
Total Man-Days
0
Total Headcount
0
Total Manhour Cost (RM)
0.00
7. SUBCONTRACTOR
| # | Subcontractor Name | Lumpsum Amount (RM) | |
|---|---|---|---|
| SUBTOTAL – SUBCONTRACTOR | 0.00 | ||
EFFECTIVE RATE CHECK
Optional — enter dimensions once and see the Final Quotation Price as RM/ft² and RM/m² (and RM/ft³, RM/m³ if Height is filled) all at the same time. Doesn't change the quote itself.
×
×
Dimensions entered in:
RM / ft²-
RM / m²-
RM / ft³-
RM / m³-
RM / ton-
COST SUMMARY
1. MaterialsRM 0.00
2. ConsumablesRM 0.00
3. TransportRM 0.00
4. CraneRM 0.00
5. ManhoursRM 0.00
6. OthersRM 0.00
7. SubcontractorRM 0.00
TOTAL COSTRM 0.00
Markup AmountRM 0.00
Final Quotation Price
RM 0.00
Legend & Notes
- Need per set (m) × Sets = Total need. Req pcs = round up (Total need ÷ Std length/pc); this auto-fills To buy (pcs) — edit it if you want spares. "Offcut" shows the leftover you still pay for.
- Price By: pcs → Amount = To buy × Unit Rate
- Price By: m → Amount = Total M (To buy × Std length/pc) × Unit Rate
- Price By: kg → Amount = Total KG × Unit Rate
- Price By: m² → set a Cover width (m) (e.g. roofing sheet effective cover 0.75); Amount = Total M × Cover width × Unit Rate
- Total M = To buy × Std length/pc; Total KG = Total M × Kg/m (you pay for full purchased pieces incl. offcut)
- 📦 Materials DB – Click to manage your materials library. Use the 📦 pick button on each row to auto-fill from the database.
- Branch tag on each material (Both / JB Only / Kuching Only) controls which branch's picker shows it by default — set via the Branch field above. Switch the picker to "All Branches" to see everything.
- Manhours (day-split): Total RM = Pax × RM/hr × [ Normal Hrs × Norm Mult × (Days without OT + Days with OT) + OT Hrs × OT Mult × Days with OT + Sun/PH Hrs × Sun Mult × Sun/PH days ]. Older saved quotes keep the previous single-"Days" formula.
- Use 💾 Save JSON to preserve your work; 📂 Load JSON to restore